Survey
Map the flow, loads, routes, interfaces and current operating baseline.

CrystalAI · Smart Logistics
Choose one material flow, establish the current baseline and agree acceptance criteria before the pilot begins.
Equipment and scope confirmed following site assessment.
CrystalAI Smart Logistics
Map the flow, loads, routes, interfaces and current operating baseline.
Agree equipment, responsibilities, pilot boundary and commercial scope.
Test handovers, approved routes, exceptions and charging under agreed conditions.
Compare the results with written acceptance criteria before expansion.
CrystalAI Smart Logistics
Measure completed moves and transfer time under the agreed load and shift conditions.
Define successful delivery, downtime and exception categories.
Check agreed stop behaviour, protected areas and operator recovery procedures.
Validate docking, acknowledgements and consistency between transport and host-system records.
Targets, data sources, test duration and acceptance rules are agreed with the client in writing before work starts. No standard savings or payback is promised.